1/72 Mikoyan MiG-105-11 Epos Soviet Space-plane

0,00 CHF
TTC
Anigrand Craftswork - 1/72 Mikoyan MiG-105-11 Epos Soviet Space-plane / Lifting body project. In 1964, ex-USSR defense unit issued a 5-years military space plan, that included the 'Spiral' space-plane project. The MiG 105-11 Epos was planned as an experimental manned spacecraft, that was under development in Mikoyan bureau as a part of the Spiral program. The Spiral space system consisted of an orbital spacecraft (MiG 105) with a rocket booster and supersonic aircraft-carrier (Tupolev Article 50). After completing its orbital mission, the spacecraft would be re-entry to earth's atmosphere with the wings set as a 60-degree that served as the vertical stabilisers. The program started without leadership support in 1965. Also due to the technical difficulties, only the MiG 105-11 was built. Th
Quantité

  Garanties sécurité

(à modifier dans le module "Réassurance")

  Politique de livraison

(à modifier dans le module "Réassurance")

  Politique retours

(à modifier dans le module "Réassurance")

Anigrand Craftswork - 1/72 Mikoyan MiG-105-11 Epos Soviet Space-plane / Lifting body project. In 1964, ex-USSR defense unit issued a 5-years military space plan, that included the 'Spiral' space-plane project. The MiG 105-11 Epos was planned as an experimental manned spacecraft, that was under development in Mikoyan bureau as a part of the Spiral program. The Spiral space system consisted of an orbital spacecraft (MiG 105) with a rocket booster and supersonic aircraft-carrier (Tupolev Article 50). After completing its orbital mission, the spacecraft would be re-entry to earth's atmosphere with the wings set as a 60-degree that served as the vertical stabilisers. The program started without leadership support in 1965. Also due to the technical difficulties, only the MiG 105-11 was built. The first flight was planned to take place in 1967, but was delayed 10 years later in October 1976. Totally eight flight tests were made that included air-drop launches from a Tu-95K Bomber. In 1978, the program was ended as the funding was halted for the new Buran Shuttle programme.
ANIG2004
Neuf
Commentaires (0)
Aucun avis n'a été publié pour le moment.